Program Overview:
State: Tennessee
Incentive Type: Performance-Based Incentive
Eligible Renewable/Other Technologies: Photovoltaics, Landfill Gas, Wind, Biomass, Municipal Solid Waste, Small Hydroelectric
Applicable Sectors: Commercial, Residential, Nonprofit, Local Government, State Government, Fed. Government
Amount:$1,000 plus $0.12/kWh above the retail rate for solar and $0.03/kWh above the retail rate for all other eligible renewables
Maximum Incentive:None specified
Terms:PBI payments continue for 10 years
Eligible System Size:Minimum size: 0.5 kW
Maximum size: 200 kW
Ownership of Renewable Energy Credits:TVA
Web Site: http://www.tva.com/greenpowerswitch/partners/
Summary:
Tennessee Valley Authority (TVA) and participating power distributors of TVA power offer a production-based incentive program to Valley homeowners and businesses for the installation of renewable generation systems from the following qualifying resources: solar, wind, low-impact hydropower, and biomass called Generation Partners. The energy generated from these renewable generation systems will count towards TVA's green power pricing program, Green Power Switch.  
 
TVA will purchase 100% of the output from a qualifying system at a premium of $0.12 per kilowatt-hour (kWh) on top of the retail electricity rate for solar and $0.03 per kilowatt-hour on top of the retail electricity rate for wind, low-impact hydro, and biomass. TVA will retain all rights to any renewable energy credits (including tradable renewable credits or green tags) or other associated benefits of energy generated from the renewable nature of the qualifying system. Payment is made in the form of a credit issued by the local power company on the monthly power bill for the home or business where the generation system is located. If a qualifying system produces more electricity than the customer consumes, payment for any excess credits will be issued either monthly or annually, at the discretion of the power company. All new participants in the Generation Partners program will receive a $1,000 incentive to offset the upfront cost of the qualifying system.  
 
The installed capacity goal for the entire program is 200 megawatts (MW). The contract term is 10 years. Qualifying systems must have a minimum output of 500 watts AC and a maximum output of 200 kilowatts (kW). Installations must also comply with local codes and adhere to guidelines established by the program. All equipment must be in compliance with environmental regulations and national standards, certified by a licensed electrician, and meet all applicable codes. Systems are dual-metered and must have an external disconnect switch, must complete an interconnection agreement, and be grid-tied.  
 
As of October 2009, there are 91 distributors in the Valley that participate in the Generation Partners program; participation is at the discretion of the power company. Click here for a list of the participating utilities. For more information about the program, visit TVA Generation Partners web site or call 866-673-4340.

NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 1995-2010 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.