Skip Navigation

The U.S. Department of Energy and the North Carolina Clean Energy Technology Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in December 2014. Staff are currently working hard on the new version of DSIRE but are also maintaining the content of the current version of DSIRE. Thank you for your continued support and patience during this transition. We hope you are as excited for December as we are!

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Rhode Island

Rhode Island

Incentives/Policies for Renewables & Efficiency

Printable Version
Renewable Energy Growth Program   

Last DSIRE Review: 08/26/2014
Program Overview:
State: Rhode Island
Incentive Type: Performance-Based Incentive
Eligible Renewable/Other Technologies: Photovoltaics, Landfill Gas, Biomass, Geothermal Electric, Small Hydroelectric, Wave Energy, Fuel Cells using Renewable Fuels
Applicable Sectors: Commercial, Residential
Amount:Incentives will vary depending on the type of resource, the size of the system, and the geographic load zone area of the installation.

Solar is grouped into four categories based on size:
Small scale solar projects: up to 25kW
Medium scale solar projects: 25kW to 250 kW
Commercial scale solar projects: 250 kW to 1 MW
Large scale solar projects: 1 MW to 5 MW

Wind is grouped into two categories based on size:
Small: 50 kW to 1.5 MW
Large: 1.5MW to 5 MW

Other renewable energy systems are grouped into two categories based on size:
Small: The Board will set the nameplate capacity limit, not to exceed 1 MW
Large: Up to 5 MW
Maximum Incentive:Varies with system size, technology and geographic load zone.
Terms:Depending on the type and size of project, The term lengths will be from 15 to 20 years. However, the board may recommend shorter terms for small scale solar projects.
Eligible System Size:Maximum nameplate capacity of 5 MW.
Equipment Requirements:Projects must be new and not under construction at the time of application, with the exception of preparatory site work that is less than 25% of the total project cost.
Ownership of Renewable Energy Credits:Except for small scale Residential projects, the environmental and other attributes of the Distributed Generation projects are transferred to the Electric Distribution Company.
Authority 1:
Date Enacted:
Date Effective:
Expiration Date:
HB 7727
06/30/2014
06/30/2014
06/30/2019
Summary:

NOTE: Incentives through this program are not yet available. Electric distribution companies have until Nov 15, 2014 to submit tariffs to the Public Utility Commission (PUC). The PUC, in turn, has until March 31, 2015 to approve the tariffs.

In 2014, Act H 7727 created the Renewable Energy Growth (REG) program with the goal to the promote installation of grid connected renewable energy within the load zones of electric distribution companies (EDCs) at a reasonable cost. This tariff-based  incentive program is designed to finance the development, construction, and operation of renewable energy distributed generation projects through competitive bidding processes over 5 years to achieve specific megawatt (MW) targets. This program is implemented by the EDCs under supervision and review of the Public Utility Commission (PUC).

For period of at least 5 years, the EDCs shall file tariffs with the PUC that are designed to provide multi year performance based  incentives to eligible renewable distributed generation projects. Tariffs shall be developed by the EDCs and will be reviewed and approved by the PUC. Proposed tariffs shall include a ceiling price and term lengths that shall be from 15 to 20 years. After being approved by the PUC, the terms under the tariffs shall not be altered in any way that would undermine the reliance of those tariffs. The EDCs shall file the first set of tariffs and solicitation rules with the PUC by November 15, 2014, which the PUC shall review and approve by March 31, 2015.

Program Goal
The REG program has target install total of 160 MW of distributed renewable energy during its 5 year term. The first year of the program (2015) has an  annual target of 25 MW, 40 MW for second year, 40 MW for third and fourth year, and rest of the 160 MW for the fifth year. There is also an annual target of at least 3 MW for small scale solar projects for first 4 years of the program.

Bidding Process
Small-scale and medium-scale solar projects will submit an enrollment application to receive a standard performance based incentive for the period of years in an applicable tariff. The applications shall be selected on a first come, first served basis or by means of commission-approved lottery.

Large scale and commercial scale solar projects and all other eligible technologies shall bid a price per kilowatt-hour (kWh) for the entire output of the facility, which does not exceed the ceiling price.  The EDC will select projects based on the lowest proposed prices, time of completion of the project, and award performance based incentives to the winning bidders. In order incentivize renewable distributed generation projects, the EDC may include an incentive payment adder to the bid price of any winning bidder that propose a distributed generation project in a desired geographical load area.

The REG program shall be administered exclusively through the tariff structure and the EDC is not required to execute a power purchase agreement (PPA) for the procurement of the renewable energy for the program.

 


 
Contact:
  Consumer Information
Rhode Island Public Utilities Commission
89 Jefferson Boulevard
Warwick, RI 02888
Phone: (401) 941-4500
Fax: (401) 277-6805
Web Site: http://www.ripuc.state.ri.us
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.