The U.S. Department of Energy and the North Carolina Clean Energy Technology Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in December 2014. Staff are currently working hard on the new version of DSIRE but are also maintaining the content of the current version of DSIRE. Thank you for your continued support and patience during this transition. We hope you are as excited for December as we are!

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Nevada

Nevada

Incentives/Policies for Renewables & Efficiency

Printable Version
Interconnection Standards   

Last DSIRE Review: 09/04/2014
Program Overview:
State: Nevada
Incentive Type: Interconnection
Eligible Renewable/Other Technologies: Solar Thermal Electric, Photovoltaics, Wind, Biomass, Geothermal Electric
Applicable Sectors: Commercial, Industrial, Residential, Nonprofit, Schools, Local Government, State Government, Fed. Government
Applicable Utilities:Investor-owned utilities
System Capacity Limit:20 MW
Standard Agreement:No
Insurance Requirements:Vary by system size and/or type; levels established by PUC
External Disconnect Switch:Not addressed
Net Metering Required:No
Summary:

In December 2003, the Nevada Public Utilities Commission (PUC) adopted interconnection standards for customers of NV Energy (formerly Nevada Power and Sierra Pacific Power) with on-site generation up to 20 megawatts (MW) in capacity. These standards are largely consistent with IEEE 1547 standards, California's interconnection rule (California Rule 21) and the model interconnection agreement developed by the National Association of Regulatory Utility Commissioners (NARUC). Significantly, the PUC determined that NV Energy may assess customer-generators for past fuel and purchased-power expenses in tariffs. NV Energy has incorporated the standards into their tariffs as Rule 15.

The interconnection standards approved by the PUC also updated Nevada's net-metering policy, originally enacted in 1997. Previously, Nevada Revised Statute 704.774 addressed basic interconnection requirements for net-metered renewable-energy systems with a maximum capacity of 10 kilowatts. This statute requires net-metered systems to meet standards established by the Institute of Electrical and Electronic Engineers (IEEE), the National Electrical Code (NEC), and Underwriters Laboratories (UL). Customers who complied with these guidelines could not be required to install additional equipment (such as a manual external disconnect switch), abide by additional safety requirements or purchase additional liability insurance. An October 2008 PUC order further clarified the issue of liability by specifically requiring the removal of any tariffs' obligation that the utility be named as an additional insured on the customer's insurance.


 
Contact:
  Mark Harris
Public Utilities Commission of Nevada
Engineering Division
1150 E. William Street
Carson City, NV 89701
Phone: (775) 684-6165
Fax: (775) 684-6120
E-Mail: mpharris@puc.nv.gov
Web Site: http://www.puc.nv.gov
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.