Skip Navigation

The U.S. Department of Energy and the North Carolina Clean Energy Technology Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in December 2014. Staff are currently working hard on the new version of DSIRE but are also maintaining the content of the current version of DSIRE. Thank you for your continued support and patience during this transition. We hope you are as excited for December as we are!

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Nevada

Nevada

Incentives/Policies for Renewables & Efficiency

Printable Version
Energy Portfolio Standard   

Last DSIRE Review: 09/04/2014
Program Overview:
State: Nevada
Incentive Type: Renewables Portfolio Standard
Eligible Efficiency Technologies: Unspecified Technologies
Eligible Renewable/Other Technologies: Solar Water Heat, Solar Space Heat, Solar Thermal Electric, Solar Thermal Process Heat, Photovoltaics, Landfill Gas, Wind, Biomass, Hydroelectric, Geothermal Electric, Municipal Solid Waste, Waste Tires (using microwave reduction), Energy Recovery Processes, Solar Pool Heating, Anaerobic Digestion, Biodiesel, Geothermal Direct-Use
Applicable Sectors: Investor-Owned Utility, Retail Supplier
Standard:25% by 2025
Technology Minimum:Solar: 5% of annual requirement through 2015 (1.2% of sales in 2015); 6% for 2016-2025 (1.5% of sales in 2025)
Credit Trading:Yes (NVTREC, WREGIS)
Web Site: http://puc.nv.gov/Renewable_Energy/Portfolio_Standard/
Authority 1:
Date Enacted:
NRS 704.7801 et seq.
1997
Authority 2:
Date Effective:
NAC 704.8831 et seq.
2002
Authority 3:
Date Effective:
LCB File R167-05 (Revised Regulations)
2/23/2006
Summary:

Nevada established a renewable portfolio standard (RPS) as part of its 1997 restructuring legislation. Under the standard, NV Energy (formerly Nevada Power and Sierra Pacific Power) must use eligible renewable energy resources to supply a minimum percentage of the total electricity it sells. In 2001, the state increased the minimum requirement by 2% every two years, culminating in a 15% requirement by 2013. The portfolio requirement has been subsequently revised, most significantly by SB 358 (2009), which increased the requirement to 25% by 2025. The 2009 amendments also raised the solar carve-out, requiring utilities to meet 6% of their portfolio requirement through solar energy beginning in calendar year 2016. The solar carve-out remains at 5% through the end of calendar year 2015. In addition to solar, qualifying renewable energy resources include biomass, geothermal energy, wind, certain hydropower, energy recovery processes*, and waste tires (using microwave reduction).**

The following schedule is currently in effect:

  • 6% renewables/efficiency in 2005 and 2006
  • 9% renewables/efficiency in 2007 and 2008
  • 12% renewables/efficiency in 2009 and 2010
  • 15% renewables/efficiency in 2011 and 2012
  • 18% renewables/efficiency in 2013 and 2014
  • 20% renewables/efficiency in 2015 through 2019
  • 22% renewables/efficiency in 2020 through 2024
  • 25% renewables/efficiency in 2025 and thereafter

Energy Efficiency as an Eligible Resource

AB 3 (2005) allowed efficiency measures to be used to satisfy a portion of the requirement. To qualify as portfolio energy credits, efficiency measures must be: (1) implemented after January 1, 2005; (2) sited or implemented at a retail customer’s location; and (3) partially or fully subsidized by the electric utility. The measure must also reduce the customer’s energy demand (as opposed to shifting demand to off-peak hours). The contribution from energy efficiency measures to meet the portfolio standard was originally capped at one-quarter of the total standard in any particular year. SB 252 (2013) established the following schedule for reducing the extent to which energy efficiency can be used to comply with the standard:

  • No more than 25% of the requirement for calendar years 2013 and 2014
  • No more than 20% of the requirement for calendar years 2015 through 2019
  • No more than 10% of the requirement for calendar years 2020 through 2024
  • 0% of the requirement for calendar years 2025 and all subsequent years

Portfolio Energy Credits and Credit Multipliers

The Public Utilities Commission of Nevada (PUCN) has established a program to allow energy providers to buy and sell portfolio energy credits (PECs) in order to meet energy portfolio requirements. One PEC represents one kilowatt-hour (kWh) of electricity generated by a portfolio energy system, with the exception of photovoltaics (PV), for which 2.4 PECs are credited per one actual kWh of energy produced. Per SB 252 (2013) this multiplier will end for new solar systems installed after December 31, 2015, but will continue for existing net metered solar PV systems. An adder of 0.05 is tacked on to the 2.4 multiplier for PV if the system is deemed by the PUCN to be a customer-maintained distributed generation system; that is, customer-sited PV is eligible for a 2.45 multiplier. In addition, the number of kWh saved by energy efficiency measures is multiplied by 1.05 to determine the number of PECs. For electricity saved during peak periods as a result of efficiency measures, the credit multiplier is increased to 2.0. 

AB 388 (2013) clarified that the amount of energy provided by a system does not include any electricity generated by the system and used for its basic operations that reduce the amount of electricity delivered to the grid. The legislation specifically references electricity used for the heating, lighting, air conditioning and equipment of a building located on the site; and electricity used by a geothermal facility for the extraction and transportation of geothermal brine or used to pump or compress geothermal brine.  These amendments apply to any facility placed into service on or after January 1, 2016; however, systems which are placed into service after that date but had contracts in place prior to December 31, 2012 are grandfathered in. 

350 Megawatt Requirement (NV Energy)
Senate Bill 123 (2013) requires NV Energy to retire 800 megawatts (MW) of coal-fired electric generating plants, in phases, by December 31, 2019. To offset these retirements, the legislation requires the utility to purchase, construct, or aquire 900 MW of power, in phases, from cleaner facilities. Of this total, 350 MW must come from new renewable energy facilities. By the end of years 2014, 2015, and 2016, the utility must issue a request for proposals for 100 MW of generating capacity from new renewable energy facilities. The final 50 MW of generating capacity from new renewable energy facilities must be owned and operated by the utility and construction must be completed by December 31, 2021. These requirements are separate from the 25% requirement under the RPS, and the PECs associated with these projects can be used to comply with the RPS.  

Temporary Renewable Energy Development Program
To help facilitate the renewable projects required by the renewable energy portfolio standard, the PUCN established the Temporary Renewable Energy Development (TRED) Program. The TRED Program is meant to insure prompt payment to renewable energy providers in order to encourage completion of renewable energy projects. The TRED Program establishes: (1) a TRED charge, allowing investor-owned utilities to collect revenue from electricity customers to pay for renewable energy separate from other wholesale power purchased by the electric utilities; and (2) an independent TRED trust to receive the proceeds from the TRED charge and remit payment to renewable energy projects that deliver renewable energy to purchasing electric utilities.

NV Energy and Shell Energy, which provides power to Barrick Goldstrike, Turquoise Ridge, and Cortez Mines, were in compliance for program year 2013 for solar and non-solar components of the Nevada RPS. In 2012, NV Energy met its solar and non-solar RPS requirements, while Shell Energy met its solar RPS requirement but not its non-solar requirements.
 

*The statutes define "energy recovery processes" as electricity generating systems with a nameplate capacity of 15 megawatts or less that convert the otherwise lost energy from "the heat from exhaust stacks or pipes used for engines or manufacturing or industrial processes; or the reduction of high pressure in water or gas pipelines before the distribution of the water or gas." To qualify, the system cannot use additional fossil fuel or require a combustion process to generate the electricity.

**Electricity produced from microwave reduction of tires must not involve combustion of the tire, and is credited as 0.7 kWh of renewable energy for every 1.0 kWh of actual electricity generated.


 
Contact:
  Mark Harris
Public Utilities Commission of Nevada
Engineering Division
1150 E. William Street
Carson City, NV 89701
Phone: (775) 684-6165
Fax: (775) 684-6120
E-Mail: mpharris@puc.nv.gov
Web Site: http://pucweb1.state.nv.us/PUCN/
 
  Darci Dalessio
Public Utilities Commission of Nevada
PEC Administrator
Carson City, NV 89701
Phone 2: (775) 684-6171
E-Mail: dalessio@puc.nv.gov
Web Site: http://www.puc.nv.gov
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.