New Hampshire Incentives/Policies for Renewables & Efficiency |
 |
Last DSIRE Review: 03/27/2013
Program Overview:
| State: |
New Hampshire |
| Incentive Type: |
State Rebate Program |
| Eligible Efficiency Technologies: |
Furnaces , Boilers |
| Applicable Sectors: |
Residential, Multi-Family Residential |
| Amount: | 30% |
| Maximum Incentive: | $6,000 |
| Eligible System Size: | Must provide at least 75% of the home heating load needs |
| Equipment Requirements: | System must be new, with minimum efficiency rating of 80%. System must be bulk-fuel-fed and meet specified air-quality standards. |
| Installation Requirements: | System must be installed at applicant's primary residence by authorized installer |
| Funding Source: | New Hampshire Renewable Energy Fund (FY 2013) |
| Program Budget: | $450,000 (FY 2013-14 funding) |
| Start Date: | 04/14/2010 |
| Expiration Date: | When program funding is exhausted |
| Web Site: |
http://www.puc.nh.gov/Sustainable%20Energy/RenewableEnergyRebates...
|
Summary:
The New Hampshire Public Utilities Commission (PUC) is offering rebates of 30% of the installed cost of qualifying new residential bulk-fed, wood-pellet central heating boilers or furnaces. The maximum rebate is $6,000. To qualify, systems must (1) become operational on or after May 1, 2012; (2) be at least 80% efficient; (3) meet certain air quality standards; (4) provide at least 75% of a home heating-load needs; and (5) be installed by a qualified installer or a licensed plumber with wood-pellet central boiler system training. Additional system requirements are specified in the program application. Modifications to existing systems are not eligible to receive funding under this program.
To receive a rebate, applicants must submit a pre-approval application to ensure funding availability. After receiving verification of eligibility and securing a place in the funding queue, applicants have three months to complete the installation. Applicants must submit a final rebate request and required documentation after the system installation is complete. When all available program funding has been reserved for approved projects, applicants that meet all program and project requirements will be placed on a waiting list. Projects placed on the waiting list are not guaranteed funding.
This program is now funded by the New Hampshire Renewable Energy Fund. It was previously funded by the federal American Recovery and Reinvestment Act of 2009.
|
Contact:
| |
NH Public Utilities Commission Info (NH PUC)
New Hampshire Public Utilities Commission
Sustainable Energy Division
21 South Fruit St., Suite 10
Concord, NH 03301
Phone: (603) 271-2431
Fax: (603) 271-3868
Web Site: http://www.puc.nh.gov
|
|
|
|
 |
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.
While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.
|