Skip Navigation

The U.S. Department of Energy and the North Carolina Clean Energy Technology Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in December 2014. Staff are currently working hard on the new version of DSIRE but are also maintaining the content of the current version of DSIRE. Thank you for your continued support and patience during this transition. We hope you are as excited for December as we are! The U.S. Department of Energy and the North Carolina Solar Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in the summer of 2014. Staff are currently working hard on the new DSIRE and are unfortunately only able to make minimal updates to the DSIRE website at this time. We apologize for any inconvenience and thank you for using DSIRE.

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Missouri

Missouri

Incentives/Policies for Renewables & Efficiency

Printable Version
Energy Efficiency in Public Buildings   

Last DSIRE Review: 08/19/2014
Program Overview:
State: Missouri
Incentive Type: Energy Standards for Public Buildings
Eligible Efficiency Technologies: Water Heaters, Furnaces , Central Air conditioners, Comprehensive Measures/Whole Building
Eligible Renewable/Other Technologies: Passive Solar Space Heat, Solar Water Heat, Solar Space Heat, Photovoltaics, Wind, Biomass, Geothermal Electric, Geothermal Heat Pumps, CHP/Cogeneration, Hydrogen, Waste Heat, District Heating and Cooling, Small Hydroelectric, Other Distributed Generation Technologies, Geothermal Direct-Use
Applicable Sectors: State Government
Requirement:All state agencies under the direction of the Office of Administration must institute policies that will reduce energy consumption by 2% annually for the next 10 years.
The energy code for state construction, substantial renovations, and leasing of buildings larger than 5,000 square feet must be at least as efficient as the 2006 IECC.
Life-cycle cost analysis with 25-year time horizon is required for state construction and major renovations and must include analysis of renewable energy systems.
Web Site: http://energy.mo.gov/energy
Authority 1:
Date Enacted:
8.800 R.S. Mo., et seq.
1993 (subsequently amended)
Authority 2:
Date Enacted:
Executive Order No. 09-18
04/23/2009
Authority 3:
Date Enacted:
Date Effective:
10 CSR 140-7.010
07/11/1995
02/25/1996
Summary:

Energy Conservation Goals

In April 2009 Missouri’s Governor issued Executive Order No. 09-18, requiring all state agencies whose building management falls under the Office of Administration to adopt policies designed to reduce energy consumption by 2% each year for the next 10 years.

Building Construction and Renovation Requirements

Life-Cycle Analysis

Life-cycle cost analysis is required for all new construction of state buildings and substantial renovations of existing state buildings when major energy systems are involved. Substantial renovations involve projects that will affect at least 50% of the building's square footage or cost at least 50% of its market value.

The analysis must take into account the initial construction costs and the proposed energy consumption, operation, and maintenance costs over a 25-year time horizon. The final design must have the lowest life-cycle cost possible while still meeting the building's space and use requirements. The analysis is required to examine all commercially available technology, including renewable energy sources, earth-sheltered construction, systems to recover and use waste heat, thermal storage heat pump systems, ambient thermal energy, district heating and cooling systems, devices to reduce water consumption, and plumbing systems to recover gray water for reuse. Plans must be reviewed by the Director of the Division of Design and Construction within the Missouri Office of Administration.

Minimum Energy Codes

In 2008 the state updated its energy code for state construction and renovations of public buildings larger than 5,000 square feet. The Missouri Department of Natural Resources (DNR) is required to establish minimum energy efficiency standards for state buildings at least as stringent as the 2006 International Energy Conservation Code (IECC) by January 1, 2009. The standards apply equally to both state-leased and state-owned buildings for which the building design process or the lease begins after July 1, 2009. The Commissioner of the Office of Administration may grant waivers to these requirements if compliance is expected to exceed the energy cost gained or if the requirement would compromise safety.

Under Executive Order No. 09-18, new construction projects undertaken by covered agencies are required to use energy efficiency standards at least as stringent as the most recent version of the IECC.


 
Contact:
  General Information
Office of Administration
Division of Facilities Management, Design, and Construction
Harry S. Truman Building, Rm. 730
301 West High Street
Jefferson City , MO 65101
Phone: (573) 751-3339
Fax: (573) 751-7277
E-Mail: fmdcmail@oa.mo.gov
Web Site: http://oa.mo.gov/fmdc/
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.