The U.S. Department of Energy and the North Carolina Clean Energy Technology Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in December 2014. Staff are currently working hard on the new version of DSIRE but are also maintaining the content of the current version of DSIRE. Thank you for your continued support and patience during this transition. We hope you are as excited for December as we are! The U.S. Department of Energy and the North Carolina Solar Center are excited to announce that a new, modernized DSIRE is under construction. The new version of DSIRE will offer significant improvements over the current version, including expanded data accessibility and an array of new tools for site users. The new DSIRE site will be available in the summer of 2014. Staff are currently working hard on the new DSIRE and are unfortunately only able to make minimal updates to the DSIRE website at this time. We apologize for any inconvenience and thank you for using DSIRE.

US Department Energy Efficiency and Renewable Energy
IREC North Carolina Solar Center
Home Glossary Links FAQs Contact About Twitter    Facebook
Massachusetts

Massachusetts

Incentives/Policies for Renewables & Efficiency

Printable Version
Interconnection Standards   

Last DSIRE Review: 08/19/2014
Program Overview:
State: Massachusetts
Incentive Type: Interconnection
Eligible Renewable/Other Technologies: Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass, Hydroelectric, Geothermal Electric, Fuel Cells, Municipal Solid Waste, CHP/Cogeneration, Fuel Cells using Renewable Fuels, Microturbines, Other Distributed Generation Technologies
Applicable Sectors: Commercial, Industrial, Residential, Nonprofit, Schools, Local Government, State Government, Fed. Government
Applicable Utilities:Investor-owned utilities
System Capacity Limit:No limit specified
Standard Agreement:Yes
Insurance Requirements:Vary by system size, type, and sector; levels established by DPU
External Disconnect Switch:Utility's discretion
Net Metering Required:No
Web Site: http://sites.google.com/site/massdgic
Authority 1:
Date Enacted:
Model Interconnection Tariff
3/13/2013
Authority 2:
Date Enacted:
S.B. 2395 (Session Law Chapter 209)
08/03/2012
Authority 3:
Date Enacted:
Order No. 11-75-E
3/13/2013
Authority 4:
Date Enacted:
Order 11-75-F
07/31/2014
Summary:

Note: On July 31, 2014, the Massachusetts Department of Public Utilities (DPU) approved an interconnection timeline enforcement mechanism with Order 11-75-F. The state's investor-owned utilities are each required to file an interconnection tariff that is consistent with this timeline enforcement mechanism within 30 days of the order.

In February 2011, the DPU opened up a docket to examine net metering and interconnection of distributed generation. While the intent is to make changes to net metering, issues relating to interconnection will be addressed. For more information about that docket, please visit the DPU Docket system, Docket 11-11. In addition, DPU Docket 11-75 is an ongoing investigation on distributed generational interconnection.

Massachusetts's interconnection standards apply to all forms of distributed generation (DG), including renewables, and to all customers of the state's four investor-owned utilities (Unitil, NSTAR, National Grid, and Western Massachusetts Electric Company).

The Model Interconnection Tariff (most recently amended in March 2013) includes provisions for three basic paths for interconnection.

  • The Simplified interconnection process applies to IEEE 1547.1-certified, inverter-based facilities with either 1) a power rating of 15 kW for single-phase systems located on radial EPSs under certain conditions; 2) a power rating of 25 kW or less for three-phase systems (depending on system configuration), located on radial EPSs under certain conditions; 3) a power rating of less than 1/15 of the customer's minimum load and located on a spot network EPS; or 4) a power rating of less than 1/15 of the customer's minimum load and 15 kW or less and located on an areas network EPS with a rating of less than 1/15 of the customer's minimum load and 15 kW or less. There are no fees associated with the simplified process.*
  • The Expedited interconnection process is for IEEE 1547.1-certified facilities that pass certain pre-specified screens on a radial EPS. Application fees are based on the size of the system.*
  • The Standard process is for all other facilities that do not meet the specifications of the Simplified or Expedited process for systems on radial and spot network EPSs, and for all facilities on area network EPSs. Application fees are based on the size of the system.*

The issue of interconnection to network systems is particularly important in Massachusetts because network systems are commonly used in dense urban areas, such as Boston. Order 11-75-E implemented a more transparent Supplemental Review screen process for projects that fail the initial Simplified and Expedited Screens. If a project fails the Simplified and Expedited screens, it must pass three supplemental review screens, otherwise it must go through the full standard review process. Massachusetts uses a 100% of minimum load penetration screen in the supplemental review process. If the generating capacity is less than 100% of minimum load, it  may not require a detailed study. In addition to these different paths, all systems 500 kW or greater, facility owners must request and receive a pre-application report from the utility. The pre-application report is optional for facilities less than 500 kW; no fee is charged for this report.

For the simplified and expedited interconnection paths, technical requirements are based on the IEEE 1547 and UL 1741 standards. A manual external disconnect switch may be required at the discretion of the utility (project-specific, not required in the tariffs). Utilities must collect and track information on the interconnection process. This information will be used in revising and updating the standards.

In August 2011, the Department of Energy Resources (DOER) submitted the Massachusetts Distributed Generation Interconnection Report to the DPU outlining its recommendations for improved interconnection policies and processes based on its research, which included an extensive stakeholder survey, conducted in April 2011. In September 2012, the Massachusetts Distributed Generation Interconnection Working Group submitted its final report recommending changes to the state's interconnection standards. DPU incorporated changes from comments submitted in Docket 11-75, and adopted the report those changes in March 2013.

 

*As part of Order 11-75-E (March 2013), the Department of Public Utilities called for an investigation of fees associated with interconnection. The application fees may change as a result of this investigation.


 
Contact:
  Brian Ritzinger
Department of Public Utilities
Electric Power Division
One South Station
Second Floor
Boston, MA 02110
Phone: (617) 305-3578
E-Mail: brian.ritzinger@state.ma.us
Web Site: http://www.state.ma.us/dpu
NCSU - home
Disclaimer: The information presented on the DSIRE web site provides an unofficial overview of financial incentives and other policies. It does not constitute professional tax advice or other professional financial guidance, and it should not be used as the only source of information when making purchasing decisions, investment decisions or tax decisions, or when executing other binding agreements. Please refer to the individual contact provided below each summary to verify that a specific financial incentive or other policy applies to your project.

While the DSIRE staff strives to provide the best information possible, the DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. make no representations or warranties, either express or implied, concerning the accuracy, completeness, reliability or suitability of the information. The DSIRE staff, the N.C. Solar Center, N.C. State University and the Interstate Renewable Energy Council, Inc. disclaim all liability of any kind arising out of your use or misuse of the information contained or referenced on DSIRE Web pages.

Copyright 2013 - 2014 North Carolina State University, under NREL Subcontract No. XEU-0-99515-01. Permission granted only for personal or educational use, or for use by or on behalf of the U.S. government. North Carolina State University prohibits the unauthorized display, reproduction, sale, and/or distribution of all or portions of the content of the Database of State Incentives for Renewables and Efficiency (DSIRE) without prior, written consent.